// Capabilities

Everything between your design and a fielded unit.

One partner at the center of your defense supply chain — six integrated functions, from procurement through sustainment, run from NDAA-compliant US facilities under one documentation system.

// 01 — Procurement

Procurement

Sourcing to your approved bill of materials — with supply-chain risk managed before it ever reaches the line.

Strategic sourcing

Sourcing to your approved BOM, component sourcing rules, and US-based supply strategies.

Vendor & supply-chain risk management

Supplier qualification, second-source planning, and lead-time risk managed ahead of production.

Sourcing documentation

Component sourcing documentation maintained and available for NDAA and program compliance review.

Customer-owned inventory controls

Programs can direct approved vendors and retain ownership of controlled inventory.

// 02 — Receiving & Inventory

Receiving & Inventory

Component custody from receiving dock to finished unit, documented the way program compliance review expects.

Incoming inspection

Components are received, inspected, and logged with lot-level tracking from the moment they hit the dock.

SKU & lot control

SKU-level inventory with lot and revision control, so every component is traceable to the unit it built.

Lot-controlled warehousing

Components and finished goods stored in our Charlotte, NC and Dallas–Fort Worth, TX facilities with documented inventory control and chain of custody.

Kitted line-feed

Builds are kitted to your BOM and fed to the line in production order — the discipline that keeps lots traceable and lines moving.

// 03 — Assembly & Integration

Assembly & Integration

Final assembly from components to tested, deployment-ready units — drones and defense hardware. You keep engineering and design; we operate the production line.

Build to work order

Airframe, electro-mechanical, and control-system assembly — motors, harnesses, sensors, and integration built to your work instructions.

Firmware & functional test

In-line stations load firmware, run your test protocols, and record results. Every unit ships configured and verified, with test data on file.

Prototype-to-production ramp

Flexible capacity from hundreds to tens of thousands of units. Typical onboarding to first production units: 2–4 weeks.

Design revision handling

A tight feedback loop with your engineering team incorporates revisions mid-program without halting the line — flexibility a traditional CM can't match.

Unit-rate pricing

A fixed cost per assembled, tested unit. Predictable program cost; our incentive is your throughput.

// 04 — Order Fulfillment

Order Fulfillment

One coordination point for purchase-order execution — output managed to world-class SLAs.

PO execution

Purchase orders executed against agreed schedules, quantities, and quality criteria.

Single coordination point

A dedicated account liaison owns your program — one accountable point of contact, not a queue.

World-class SLAs

Output, quality, and on-time delivery tracked to service-level targets with daily visibility.

Production reporting

Throughput, quality, and constraint reporting on a cadence your program office can audit.

// 05 — Logistics & Delivery

Logistics & Delivery

Finished units don't sit. We pack and deliver against program schedules — managed transportation to the point of need.

Finished-goods management

Serialized finished-unit storage with full inventory visibility until your program calls for delivery.

Custom packaging

Program-specific packaging engineered for the unit — protective, kitted with accessories and documentation, ready for the field.

Managed transportation

Inbound and outbound transportation managed end to end — to your customers, depots, or DoW delivery points, against hard program windows.

// 06 — MRO & Sustainment

MRO & Sustainment

Fielded units stay mission-capable. Spares, repair, and refresh handled in the same facilities, under the same documentation discipline.

Spares kitting

Repair kits, propeller kits, battery and accessory kits, and field-support kits ready for resupply.

Field resupply

Replenishment programs sized and scheduled to keep fielded units operational.

Repair & refresh

Returns, rework, and field-refresh programs handled under the same traceability standard.

Sustainment support

Long-tail sustainment for serialized units, with records that follow each unit through its life.

Beyond drones: advanced electro-mechanical assembly.

The same lines handle robotics, marine stabilization systems, and IT hardware — precision electro-mechanical assembly with the same traceability standard.

Discuss Your Build